6800 Zoo Dr, Kansas City, MO 64132 Alpha-Omega Geotech's relationship with the Kansas City Zoo took another step forward in 2023 with the Sea Lion Splash exhibit. A $4 million overhaul of the exhibit provided a long-awaited swim into modern times, complete with new seating and A.D.A. compliance. We enjoyed contributing our services to this hometown project, ranging Read More »
aLoft and Cascade Hotels by Marriott | Country Club Plaza
Alpha-Omega Geotech played a key role in ensuring quality construction of the aLoft and Cascade Hotels on the Country Club Plaza through Materials Testing and Special Inspections services, and a reputation for keeping work on schedule and within budget.
Lawrence Theatre
Lawrence Theatre - New Building Construction The Lawrence Theatre building was built using a structural steel frame with precast and masonry exterior walls. AOG provided all the geotechnical laboratory testing and field inspections for the project, including concrete testing and reinforcing inspections; grout and mortar testing; and high-strength bolting and structural welding inspections for the entire structure. Read More »
Doubletree Hotel
Doubletree Hotel In 2009, the Doubletree Hotel in Overland Park, Kansas had an ongoing slab settlement issue on the ground floor of the main building. They worked with the structural engineers from Krudwig and Associates to help determine the cause, and Krudwig engineers contacted us to assist in the repair. AOG engineers suspected the clay soil beneath Read More »
Marriott Muehlebach Hotel
Marriott Muehlebach Hotel In 1996 Marriott Hotels bought the Muehlebach and made it into an extension of the Kansas City Marriott Downtown. O’Rourke Wrecking Company imploded the 1952 Muehlebach Tower annex building and in 1998, built a new, modern Muehlebach tower to meet current building code standards. A sky bridge was also built to connect both hotel buildings on Read More »